Sec. 1224. Old River control structure, Louisiana
121 words·~1 min read·
/bill/115/s/3021/eah/section-1224A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Not later than 180 days after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on the structure and operations plan for the Old River control structure authorized by the Flood Control Act of 1954 (68 Stat. 1258), based on the best available science, improved monitoring capabilities, and other factors as determined by the Secretary, including consideration of— flood control; navigational conditions; water supply; ecosystem restoration and ecological productivity; and hydroelectric production.
In developing the report required by subsection (a), the Secretary shall provide opportunity for public input and stakeholder engagement, including public meetings.
Connections1 off-index
1 reference not yet in our index
- 68 Stat. 1258
Citation graph
cites case law
Sec. 1224
Old River control structure, Louisiana
Stat.68 Stat. 1258
Cites 1Cited by 0 across 0 sources