Sec. 109.
109 words·~1 min read·
/bill/115/s/1609/pcs/section-109·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Relative to the Rough River Lake Flowage Easement Encroachment Resolution Plan, the Chief of Engineers shall submit to the Committees on Appropriations of both Houses of Congress, not later than 90 days after the date of enactment of this Act, a report that includes an inventory of habitable structures and improvements built, installed, or established in the flowage easement boundary; whether each such structure or improvement in the inventory was built, installed or established within the flowage easement boundary before or after the surveys conducted by the Corps of Engineers in 2013, 2014, and 2015; and what notice landowners had of the flowage easement boundary prior to those surveys.