Sec. 308. Kissimmee River restoration, Central and Southern Florida
126 words·~1 min read·
/bill/115/hr/8/eh/section-308A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Not later than 30 days after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on the total estimated value of in-kind contributions made by the non-Federal interest with respect to the following six actions, as described in the final report of the Director of Civil Works on the Central and Southern Florida Project, Kissimmee River Restoration Project, dated April 27, 2018:
Shady Oaks Fish Camp land preparation. Rocks Fish Camp land preparation. Levee breaching of Sparks Candler and Bronson Levees. Packingham Slough construction related to land acquisition. Engineering analysis of River Acres engineering solution. Small local levee modifications.