Sec. 3. Applicability of spill prevention, control, and countermeasure rule
226 words·~1 min read·
/bill/114/s/2993/is/section-3A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
In implementing the spill prevention, control, and countermeasure rule with respect to any farm, the Administrator shall— require a certification of compliance with the spill prevention, control, and countermeasure rule by— a professional engineer for a farm with— an individual tank with an aboveground storage capacity that is greater than 10,000 gallons; an aggregate aboveground storage capacity that is not less than 42,000 gallons; or a history of a spill; or the owner or operator of the farm (via self-certification) for a farm with— an aggregate aboveground storage capacity that is— greater than 10,000 gallons; and less than 42,000 gallons; and no history of a spill; and exempt from all requirements of the spill prevention, control, and countermeasure rule any farm with— an aggregate aboveground storage capacity that is not greater than 10,000 gallons; and no history of a spill.
For purposes of subsection (a), the calculation of the aggregate aboveground storage capacity of a farm shall not include any container on a separate parcel with a capacity that is less than 1,320 gallons. For purposes of subsection (a), the calculations of the aggregate aboveground storage capacity of a farm and the aboveground storage capacity of an individual tank on a farm shall not include any container holding animal feed ingredients that are approved by the Commissioner of Food and Drugs for use in livestock feed.