Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · BILL · 114th Congress · S. 2943 (Engrossed in Senate) — To authorize appropriations for fiscal year 2017 for military activities of the Department of Defense, for military c... · Sec. 1011

Sec. 1011. Availability of funds for retirement or inactivation of cruisers or dock landing ships

962 words·~4 min read·/bill/114/s/2943/es/section-1011·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Except as provided in subsections
(b)through (g), none of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2017 may be obligated or expended to retire, prepare to retire, or inactivate a TICONDEROGA–class cruiser, WHIDBEY ISLAND–class dock landing ship, or HARPERS FERRY–class dock landing ship. The Chief of Naval Operations shall certify to the congressional defense committees the Navy requirement for operational cruisers and dock landing ships, as provided under subsection (d)(1), from fiscal year 2017 through fiscal year 2030. The certification shall also state the requirement for basic (BMD 3.X), intermediate (BMD 4.X), and advanced (BMD 5.X) ballistic missile defense capability on operational cruisers from fiscal year 2017 through fiscal year 2030. Funds within the Ship Modernization, Operations, and Sustainment Fund (SMOSF) shall only be used for 11 TICONDEROGA-class cruisers (CG–63 through CG–73) and 3 WHIDBEY ISLAND-class dock landing ships (LSD–41, LSD–42, and LSD–46). The Secretary of the Navy shall retain the current inventory of 22 TICONDEROGA-class cruisers and 12 WHIDBEY ISLAND- or HARPERS FERRY-class dock landing ships until the end of their service lives, as follows: Through fiscal year 2030, the Navy shall maintain not less than the Chief of Naval Operations’ requirement for operational cruisers certified under subsection
(b)or 11 operational cruisers, whichever is greater. The Navy shall maintain no less than the Chief of Naval Operations’ requirement for dock landing ships certified under subsection
(b)or 9 operational dock landing ships, whichever is greater. The Navy is authorized to conduct phased modernization of not more than 11 cruisers and 3 dock landing ships. During the phased modernization period, the Navy may reduce manning on these ships to the minimal level necessary to ensure safety and security of the ship and to retain critical skills. Only the ships listed in subsection
(c)may undergo phased modernization. Ships undergoing phased modernization shall comply with subsection (e). Each of the cruisers described under paragraph
(1)may be decommissioned at the end of its service life concurrent with being replaced by a cruiser that completes phased modernization pursuant to paragraph (2). After being reintroduced into the operational fleet, each of the cruisers modernized pursuant to paragraph
(2)may be decommissioned upon reaching its expected service life. For purposes of this subsection, an operational cruiser or dock landing ship is available for worldwide deployment other than during routine or scheduled maintenance or repair. During the period of phased modernization authorized under subsection (d), the Secretary of the Navy shall— continue to maintain the ships in a manner that will ensure the ability of the ships to re-enter the operational fleet in accordance with paragraph
(3)of such subsection; conduct planning activities to ensure scheduled and deferred maintenance and modernization work items are identified and included in maintenance availability work packages; conduct hull, mechanical, and electrical (HM&E) and combat system modernization necessary to achieve a service life of 40 years; conduct basic (BMD 3.X), intermediate (BMD 4.X), and advanced (BMD 5.X) ballistic missile defense capability upgrades to meet or exceed the Chief of Naval Operations’ requirement certified under subsection (b); and complete maintenance and modernization of the cruisers, including required testing and crew training, to allow for a one-for-one replacement of operational cruisers in accordance with subsection (d)(3). During the period of phased modernization authorized under subsection (d), the Secretary of the Navy may not— permit removal or cannibalization of equipment or systems, unless planned for full replacement or upgrade during phased modernization, other than equipment or systems explicitly identified as— rotatable pool equipment; or necessary to support urgent operational requirements approved by the Secretary of Defense; make any irreversible modifications that will prohibit the ship from re-entering the operational fleet; through fiscal year 2030, reduce the quantity of operational cruisers below the number certified to be required by the Chief of Naval Operations under subsection
(b)or 11 operational cruisers, whichever is greater; through fiscal year 2030, reduce the quantity of operational dock landing ships below the number certified to be required by the Chief of Naval Operations under subsection
(b)or 9 operational dock landing ships, whichever is greater; and through fiscal year 2030, reduce the basic, intermediate, or advanced ballistic missile defense capability on operational cruisers below the quantities certified to be required by the Chief of Naval Operations under subsection (b). The Secretary of the Navy shall submit to the congressional defense committees an annual report on the status of the phased modernization program. This report shall accompany the budget of the President submitted to Congress under section 1105(a) of title 31, United States Code. The report shall include, with respect to the ships undergoing phased modernization pursuant to subsection (d)(2), the following information: The status of modernization efforts, by vessel, including availability schedules, equipment procurement schedules, and annual funding requirements from the fiscal year of induction into the phased modernization program through the fiscal year of planned re-entry into the operational fleet. Each vessel’s current readiness, operational, and manning status. An assessment of each vessel’s current materiel condition. A list of rotatable pool equipment that is identified across the classes of cruisers and dock landing ships as necessary to support operations on a continuing basis. A list of equipment, other than rotatable pool equipment, removed from each vessel, including a justification for the removal, the disposition of the equipment, and plan for restoration of the equipment. A list of planned obligations and expenditures, by vessel, for the fiscal year of the budget of the President submitted to Congress. The Secretary of the Navy shall notify the congressional defense committees in writing 30 days prior to executing any deviations to the plans provided pursuant to paragraphs
(1)and
(6)of subsection
(f)of the most recent report required under such subsection.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.