Sec. 3005. National goals for production and site identification
97 words·~1 min read·
/bill/114/s/2012/es/section-3005A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
It is the sense of Congress that, not later than 10 years after the date of enactment of this Act— the Secretary of the Interior shall seek to approve a significant increase in new geothermal energy capacity on public land across a geographically diverse set of States using the full range of available technologies; and the Director of the Geological Survey and the Secretary should identify sites capable of producing a total of 50,000 megawatts of geothermal power, using the full range of available technologies, through a program conducted in collaboration with industry, including cost-shared exploration drilling.