Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · BILL · 114th Congress · S. 1626 (Reported in Senate) — To reauthorize Federal support for passenger rail programs, improve safety, streamline rail project delivery, and for... · Sec. 403

Sec. 403. Speed limit action plans

330 words·~2 min read·/bill/114/s/1626/rs/section-403·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Not later than 90 days after the date of enactment of this Act, each railroad carrier providing intercity rail passenger transportation or commuter rail passenger transportation, in consultation with any applicable host railroad carrier, shall survey its entire system and identify each main track location where there is a reduction of more than 20 miles per hour from the approach speed to a curve or bridge and the maximum authorized operating speed for passenger trains at that curve or bridge. Not later than 120 days after the date that the survey under subsection
(a)is complete, a rail passenger carrier shall submit to the Secretary an action plan that— identifies each main track location where there is a reduction of more than 20 miles per hour from the approach speed to a curve or bridge and the maximum authorized operating speed for passenger trains at that curve or bridge; describes appropriate actions, including modification to automatic train control systems, if applicable, other signal systems, or other practices, including increased crew communication, to enable warning and enforcement of the maximum authorized speed for passenger trains at each location identified under paragraph (1); contains milestones and target dates for implementing each appropriate action described under paragraph (2); and ensures compliance with the maximum authorized speed at each location identified under paragraph (1). Not later than 90 days after the date an action plan is submitted under subsection (a), the Secretary shall approve, approve with conditions, or disapprove the action plan. The Secretary may exempt from the requirements of this section each segment of track for which operations are governed by a positive train control system certified under section 20157 of title 49, United States Code, or any other safety technology or practice that would achieve an equivalent or greater level of safety in reducing derailment risk. Nothing in this section shall prohibit the Secretary from applying the requirements of this section to other segments of track at high risk of overspeed derailment.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.