Code · BILL · 114th Congress · S. 1202 (Introduced in Senate) — To amend the Public Utility Regulatory Policies Act of 1978 to assist States in adopting updated interconnection proc... · Sec. 4

Sec. 4. Updated interconnection procedures and tariff schedule

650 words·~3 min read·/bill/114/s/1202/is/section-4

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Section 111(d) of the Public Utility Regulatory Policies Act of 1978 ( 16 U.S.C. 2621(d) ) is amended by adding at the end the following: Not later than 1 year after the date of enactment of this paragraph, the Secretary, in consultation with the Commission and other appropriate agencies, shall establish, for generation with nameplate capacity up to 20 megawatts using all fuels— guidance for technical interconnection standards that ensure interoperability with existing Federal interconnection rules; model interconnection procedures, including appropriate fast track procedures; and model rules for determining and assigning interconnection costs. The standards established under subparagraph
(A)shall, to the maximum extent practicable, reflect current best practices (as demonstrated in model codes and rules adopted by States) to encourage the use of distributed generation (such as combined heat and power technology and waste heat to power technology) while ensuring the safety and reliability of the interconnected units and the distribution and transmission networks to which the units connect. In establishing the model standards under subparagraph (A), the Secretary shall consider the appropriateness of using standards or procedures that vary based on unit size, fuel type, or other relevant characteristics. . Section 112(b) of the Public Utility Regulatory Policies Act of 1978 ( 16 U.S.C. 2622(b) ) is amended by adding at the end the following: Not later than 90 days after the date on which the Secretary completes the standards required under section 111(d)(20), each State regulatory authority (with respect to each electric utility for which the authority has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in that section, or set a hearing date for such consideration, with respect to each standard. Not later than 2 years after the date on which the Secretary completes the standards required under section 111(d)(20), each State regulatory authority (with respect to each electric utility for which the authority has ratemaking authority) and each nonregulated electric utility shall— complete the consideration under subparagraph (A); make the determination referred to in section 111 with respect to each standard established under section 111(d)(20); and submit to the Secretary and the Commission a report detailing the updated plans of the State regulatory authority for interconnection procedures and tariff schedules that reflect best practices to encourage the use of distributed generation. . Section 112(c) of the Public Utility Regulatory Policies Act of 1978 ( 16 U.S.C. 2622(c) ) is amended by adding at the end the following: “In the case of each standard established under paragraph
(20)of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (20).”. Section 112 of the Public Utility Regulatory Policies Act of 1978 ( 16 U.S.C. 2622 ) is amended by adding at the end the following: Subsections
(b)and
(c)shall not apply to a standard established under paragraph
(20)of section 111(d) in the case of any electric utility in a State if, before the date of enactment of this subsection— the State has implemented for the electric utility the standard (or a comparable standard); the State regulatory authority for the State, or the relevant nonregulated electric utility, has conducted a proceeding after December 31, 2013, to consider implementation of the standard (or a comparable standard) for the electric utility; or the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility. . Section 124 of the Public Utility Regulatory Policies Act of 1978 ( 16 U.S.C. 2634 ) is amended by adding at the end the following: In the case of each standard established under paragraph
(20)of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (20). .
Connectionstraces to 3
Citation graph
cites case law
Sec. 4
Updated interconnection procedures and tariff schedule
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.