Sec. 127. Report on P–8 Poseidon aircraft
88 words·~1 min read·
/bill/114/hr/4909/eh/section-127·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Not later than October 1, 2017, the Secretary of the Navy shall submit to the congressional defense committees a report regarding future capabilities for the P–8 Poseidon aircraft. The report under subsection
(a)shall include, with respect to the P–8 Poseidon aircraft, the following: A review of possible upgrades by the Navy to the sensors onboard the aircraft, including intelligence, surveillance, and reconnaissance sensors currently being fielded on Air Force platforms. An assessment of the ability of the Navy to use long-range multispectral imaging systems onboard the aircraft.