Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · BILL · 114th Congress · H.R. 3867 (Introduced in House) — To authorize the Dry-Redwater Regional Water Authority System and the Musselshell-Judith Rural Water System in the St... · Sec. 5

Sec. 5. Use of power from pick-sloan program by the Dry-Redwater Regional Water Authority System

359 words·~2 min read·/bill/114/hr/3867/ih/section-5

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Congress finds that— McCone and Garfield Counties in the State were designated as impact counties during the period in which the Fort Peck Dam was constructed; and as a result of the designation, the Counties referred to in paragraph
(1)were to receive impact mitigation benefits in accordance with the Pick-Sloan program. Subject to paragraph (2), the Administrator shall make available to the Dry-Redwater Regional Water Authority System a quantity of power required, of up to 1 1/2 megawatt capacity, to meet the pumping and incidental operation requirements of the Dry-Redwater Regional Water Authority System during the period beginning on May 1 and ending on October 31 of each year— from the water intake facilities; and through all pumping stations, water treatment facilities, reservoirs, storage tanks, and pipelines up to the point of delivery of water by the water supply system to all storage reservoirs and tanks and each entity that distributes water at retail to individual users. The Dry-Redwater Regional Water Authority System shall be eligible to receive power under paragraph
(1)if the Dry-Redwater Regional Water Authority System— operates on a not-for-profit basis; and is constructed pursuant to a cooperative agreement entered into by the Secretary under section 4(b). The Administrator shall establish the cost of the power described in paragraph
(1)at the firm power rate. If power, in addition to that made available to the Dry-Redwater Regional Water Authority System under paragraph (1), is necessary to meet the pumping requirements of the Dry-Redwater Regional Water Authority, the Administrator may purchase the necessary additional power at the best available rate. The cost of purchasing additional power shall be reimbursed to the Administrator by the Dry-Redwater Regional Water Authority. The Dry-Redwater Regional Water Authority shall be responsible for the payment of the power charge described in paragraph
(4)and non-Federal delivery costs described in paragraph (6). The Dry-Redwater Regional Water Authority System shall be responsible for all non-Federal transmission and distribution system delivery and service arrangements. The Dry-Redwater Regional Water Authority System shall be responsible for funding any transmission upgrades, if required, to the integrated system necessary to deliver power to the Dry-Redwater Regional Water Authority System.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.