Sec. 181.
60 words·~1 min read·
/bill/113/s/2438/pcs/section-181A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Notwithstanding section 60117(n)(1)(B) of title 49, United States Code, the Secretary may require the person proposing any project with design and construction costs over $2,500,000,000 for the construction, expansion, or operation of a gas or hazardous liquid pipeline facility or liquefied natural gas pipeline facility to pay the costs incurred by the Secretary relating to a facility design safety review.