Sec. 234. Improvements to acquisition accountability reports on ballistic missile defense system
198 words·~1 min read·
/bill/113/hr/1960/eh/section-234·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Section 225 of title 10, United States Code, is amended— in subsection (b)(3)(A), by inserting comprehensive before life-cycle ; and by adding at the end the following: The Director shall ensure that each cost estimate included in an acquisition baseline pursuant to subsection (b)(3) includes all operation and support costs, regardless of funding source, for which the Director is responsible. In each such baseline submitted to the congressional defense committees, the Director shall state whether the underlying cost estimates in such baseline meet the criteria of the Comptroller General of the United States to be considered a high-quality estimate.
If the Director states that such estimates do not meet such criteria, the Director shall include in such baseline the actions, including a schedule, that the Director plans to carry out for the estimates to meet such criteria. . Not later than February 15, 2014, the Director of the Missile Defense Agency shall submit to the congressional defense committees a report of the plans and schedule of the Director with respect to when the Director will meet the quality and criteria of cost estimates required by section 225(e) of title 10, United States Code, as added by subsection (a)(2).