Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · Arizona · Title 45 — Trade and Commerce

45-514. Mineral extraction and metallurgical processing permit; conditions for issuance; duration of permit

677 words·~3 min read·/az/title-45/45-514

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

A. Except as provided in subsection D of this section, a person who is engaged in or proposes to engage in the extraction and processing of minerals shall be issued a permit to withdraw groundwater in the required amount, if all of the following apply:
1. The amount of groundwater available for mineral extraction, metallurgical processing and compliance with applicable environmental controls under a dewatering permit is insufficient.
2. Uncommitted municipal and industrial central Arizona project water is not available at the point where the operator's wellhead or distribution system would otherwise be, at a cost which does not exceed the current municipal and industrial central Arizona project delivery rates.
3. Other surface water of adequate quality or effluent of adequate quality is not available at the point where the operator's wellhead or distribution system would otherwise be, at a cost, including treatment costs, which does not exceed by twenty-five percent the cost the operator would otherwise incur in withdrawing groundwater.
4. The applicant does not own or lease type 2 non-irrigation grandfathered rights originally based on withdrawals of groundwater for the extraction or processing of minerals that the applicant is not using or leasing and that can be used at the proposed location without imposing an unreasonable economic burden on the applicant.
B. A permit issued pursuant to this section shall be granted for a period of up to fifty years, subject to renewal under the same criteria used in granting the original permit.
C. If, during the duration of a mineral extraction and metallurgical processing permit, the director determines that uncommitted municipal and industrial central Arizona project water is available or surface water of adequate quality or effluent of adequate quality is available to the permittee at a cost comparable to groundwater, the director may require the permittee to use such water in lieu of groundwater.
D. Beginning January 1 of the calendar year following the year in which a groundwater replenishment district is required to submit its preliminary plan pursuant to section 45-576.02, subsection A, paragraph 1, and except for an application to renew a mineral extraction and metallurgical processing permit, on receiving a permit application the director shall not issue a permit for a well in the district unless at the time the application is filed:
1. The director has determined that the district's plan for operation is consistent with achieving the management goal, according to section 45-576.03, subsection E, and the designation has not expired.
2. The master replenishment account, as established in section 45-858.01, does not have a debit balance in an amount in excess of the amount allowed under section 45-576.01, subsection A, paragraph 3.
E. If, during the duration of a mineral extraction and metallurgical processing permit issued after the effective date of this amendment to this section, the permittee earns long-term storage credits under section 45-852.01, subsection B for the storage of central Arizona project water in the active management area in which the permittee has the right to withdraw groundwater pursuant to the permit, and the central Arizona project water qualified as water that cannot reasonably be used directly due solely to the exclusion of groundwater withdrawn by the permittee for mineral extraction or metallurgical processing pursuant to section 45-802.01, paragraph 23, subdivision (c), the director shall establish a separate subaccount for those credits pursuant to section 45-852.01, subsection A.
After each calendar year in which the permit is in effect, the director shall debit the subaccount by the amount of groundwater pumped by the permittee in the active management area during that calendar year pursuant to the permit, not to exceed the amount of long-term storage credits in the subaccount. This subsection shall not apply to:
1. A mineral extraction and metallurgical processing permit issued on or before the effective date of this amendment to this section, including any renewal or modification of the permit.
2. A mineral extraction and metallurgical processing permit unless the permittee was engaged in mineral extraction and metallurgical processing within an initial active management area on or before January 1, 2011.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.