Sec. 29.55.120. Review required.
The record owner of property on which an assessment is imposed under AS 29.55.105 shall obtain
(1)for each proposed energy or resilience improvement project,
(A)a review of the energy, emissions, or resilience baseline conditions, as appropriate; and
(B)the projected reduction in energy costs, energy consumption or demand, or emissions affecting local air quality, or increase in resilience, as appropriate; and
(2)for each completed energy or resilience improvement project, verification that the energy or resilience improvement project was properly completed and is operating as intended.