Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · Virginia · Title 33.2 · Chapter 2

Code of Virginia § 33.2-280.2. Utility work database.

291 words·~1 min read·/va/title-33-2/chapter-2/33-2-280-2

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

A. As used in this section:
"Service connection" means any utility facility installed overhead or underground between a distribution main, pipelines, conduits, lines, wires, or other sources of supply and the premises of the individual customer.
"Utility work" means the construction, installation, removal, or substantial maintenance of a privately, publicly, or cooperatively owned line, facility, or system for producing, transmitting, or distributing telecommunications, cable television, electricity, gas, oil, petroleum products, water, steam, storm water not connected with highway drainage, or any other similar commodity, including any fire or police signal system. "Utility work" does not include emergency maintenance or repairs or any work directly related to any individual service connection or service drop.
B. The Department shall establish and maintain a publicly accessible database and map of all utility work that has been approved by the Department and will occur within a highway right-of-way in a residential neighborhood, as specified by the utility. Such database shall include the location where such work will occur, the start date of such work, the projected end date of such work, the company administering such work, and any other relevant information; however, under no circumstances shall such database and map provide information on any
(i)utility work within a right-of-way not maintained by the Department;
(ii)critical utility infrastructure, as designated by the utility, that, upon disclosure, has the potential to jeopardize security or critical services, including Critical Energy Infrastructure Information and Controlled Unclassified Information; or
(iii)information the permittee has designated as confidential. Such information shall be available in the database at least seven days prior to the start date of any such utility work and shall be deleted from such database 90 days after the completion of such work.
2024, c. 271 .
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.