Sec. 8220. DISPOSITION STUDY ON HYDROPOWER IN THE WILLAMETTE VALLEY, OREGON
400 words·~2 min read·
/statute-compilations/comps-17475/sec-8220A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
## SEC. 8220 DISPOSITION STUDY ON HYDROPOWER IN THE WILLAMETTE VALLEY, OREGON ###
(a)Disposition Study ####
(1)In general The Secretary shall carry out a disposition study to determine the Federal interest in, and identify the effects of, deauthorizing hydropower as an authorized purpose, in whole or in part, of the Willamette Valley hydropower project. ####
(2)Contents In carrying out the disposition study under paragraph (1), the Secretary shall review the effects of deauthorizing hydropower on— #####
(A)Willamette Valley hydropower project operations; #####
(B)other authorized purposes of such project; #####
(C)cost apportionments; #####
(D)dam safety; #####
(E)compliance with the requirements of the Endangered Species Act (16 U.S.C. 1531 et seq.); and #####
(F)the operations of the remaining dams within the Willamette Valley hydropower project. ####
(3)Recommendations If the Secretary, through the disposition study authorized by paragraph (1), determines that hydropower should be removed as an authorized purpose of any part of the Willamette Valley hydropower project, the Secretary shall also investigate and recommend any necessary structural or operational changes at such project that are necessary to achieve an appropriate balance among the remaining authorized purposes of such project or changes to such purposes. ###
(b)Report Not later than 18 months after the date of enactment of this Act, the Secretary shall issue a report to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate that describes— ####
(1)the results of the disposition study on deauthorizing hydropower as a purpose of the Willamette Valley hydropower project; and ####
(2)any recommendations required under subsection (a)(3). ###
(c)Costs Until such time as the report required under subsection
(b)is issued, any new construction-related expenditures of the Secretary at the Willamette Valley hydropower project that are assigned to hydropower shall not be reimbursable. ###
(d)Definition In this section, the term “Willamette Valley hydropower project” means the system of dams and reservoir projects authorized to generate hydropower and the power features that operate in conjunction with the main regulating dam facilities, including the Big Cliff, Dexter, and Foster re-regulating dams in the Willamette River Basin, Oregon, as authorized by section 4 of the Flood Control Act of 1938 (chapter 795, 52 Stat. 1222; 62 Stat. 1178; 64 Stat. 177; 68 Stat. 1264; 74 Stat. 499; 100 Stat. 4144).
Connectionstraces to 1
Traces to 1 document
6 references not yet in our index
- 52 Stat. 1222
- 62 Stat. 1178
- 64 Stat. 177
- 68 Stat. 1264
- 74 Stat. 499
- 100 Stat. 4144
Citation graph
cites case law
Sec. 8220
DISPOSITION STUDY ON HYDROPOWER IN THE WILLAMETTE VALLEY, OREGON
Stat.52 Stat. 1222
Stat.62 Stat. 1178
Stat.64 Stat. 177
Stat.68 Stat. 1264
Stat.74 Stat. 499
Cites 7 · showing 6Cited by 0 across 0 sources