Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2024-02-21 · DEPARTMENT OF ENERGY · Rules and Regulations

Rules and Regulations. DEPARTMENT OF ENERGY

603 words·~3 min read·/register/2024/02/21/2024-03424

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 15326-000] Kram Hydro 1, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 25, 2023, Kram Hydro 1, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project proposed to be located at the U.S.
Army Corps of Engineers' (Corps) Joe Hardin Lock and Dam on Arkansas River, near the City of Grady, in Lincoln and Jefferson counties, Arkansas. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission.
The proposed Joe Hardin Lock and Dam Hydroelectric Project would consist of the following:
(1)a 90-foot-wide, 200-350-foot-long armored intake channel, upstream of the powerhouse;
(2)a 180-foot-long, 100-foot-wide concrete powerhouse located downstream of the existing Corps dam on the south bank, housing two identical Kaplan turbine-generator units, with a combined generating capacity of 20.0 megawatts;
(3)a 200-foot-long, 100-foot wide unlined tailrace;
(4)a 300-foot-long concrete retaining wall to be constructed downstream of the powerhouse; and
(5)a 6-mile-long, 115 kilovolt transmission line. The proposed project would have an estimated annual generation of 127 gigawatt-hours. *Applicant Contact:* Kristen Fan, Kram Hydro 1, 12333 Sowden Rd., Suite B. PMB 50808, Houston, TX 77080; phone:
(772)418-2705. *FERC Contact:* Prabharanjani Madduri; phone:
(202)502-8017, or by email at *prabharanjani.madduri@ferc.gov.* Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission's eFiling system at *https://ferconline.ferc.gov/eFiling.aspx.* Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at *https://ferconline.ferc.gov/QuickComment.aspx.* You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at *FERCOnlineSupport@ferc.gov,*
(866)208-3676 (toll free), or
(202)502-8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Debbie-Anne Reese, Acting Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P-15326-000. The Commission's Office of Public Participation
(OPP)supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at
(202)502-6595 or *OPP@ferc.gov.* More information about this project, including a copy of the application, can be viewed, or printed on the “eLibrary” link of the Commission's website at *https://elibrary.ferc.gov/eLibrary/search.* Enter the docket number (P-15326) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: February 13, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024-03424 Filed 2-20-24; 8:45 am]
Connectionstraces to 1
Citation graph
cites case law
Rules and Regulations
DEPARTMENT OF ENERGY
Cites 1Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.