Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2017-12-04 · DEPARTMENT OF ENERGY · Notices

Notices. DEPARTMENT OF ENERGY

935 words·~4 min read·/register/2017/12/04/2017-26034

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7016-006] City of Hailey, Idaho; Notice of Application for Surrender of License, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. *Type of Proceeding:* Application for surrender of exemption. b. *Project No.:* 7016-006. c. *Date Filed:* October 31, 2017. d. *Licensee:* City of Hailey, Idaho. e. *Name of Project:* Hailey Hydroelectric Project. f. *Location:* The project is located on the artesian Indian Creek Springs, in Blaine County, Idaho. g. *Filed Pursuant to:* Federal Power Act, 16 U.S.C. 791a-825r. h. *Licensee Contact:* Ms.
Mariel Miller, Public Works Director, City of Hailey, 115 Main Street South, Suite H, Hailey, ID 83333, Telephone:
(208)788-4221. i. *FERC Contact:* Mr. Ashish Desai,
(202)502-8370, *Ashish.Desai@ferc.gov.* j. Deadline for filing comments, interventions, and protests is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests and comments using the Commission's eFiling system at *http://www.ferc.gov/docs-filing/efiling.asp.* Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at *http://www.ferc.gov/docs-filing/ecomment.asp.* You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at *FERCOnlineSupport@ferc.gov,*
(866)208-3676 (toll free), or
(202)502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P-7016-006. k. *Description of Project Facilities:* The project consists of the City of Hailey's groundwater collection and power production facilities, including:
(1)A spring collection system, comprising 10-inch-diameter infiltration pipes and a collection box;
(2)a 2.5-mile-long, 12-inch-diameter penstock connecting the collection system to the powerhouse;
(3)a 700-foot-long, 18-inch-diameter steel penstock, bifurcated from the water main;
(4)a powerhouse containing one generating unit rated at 56 kilowatts; and
(5)an 800-foot-long, underground transmission line. The City of Hailey sells project power to Idaho Power. l. *Description of Request:* On August 24, 2017, the Commission issued an Order Ruling on Declaration of Intention and Finding Licensing Not Required for the project under docket number DI17-6-000 finding that a license or exemption for licensing is not required to operate and maintain the project. As a result, the exemptee, the City of Hailey, Idaho, has determined it would like to surrender the exemption. No ground disturbance is associated with the proposed surrender and project features will remain in place. m. This filing may be viewed on the Commission's Web site at *http://www.ferc.gov/docs-filing/elibrary.asp.* Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at *http://www.ferc.gov/docs-filing/esubscription.asp* to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or email *FERCOnlineSupport@ferc.gov,* for TTY, call
(202)502-8659. A copy is also available for inspection and reproduction in the Commission's Public Reference Room located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling
(202)502-8371. n. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission. o. *Comments, Protests, or Motions to Intervene:* Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .212 and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. p. *Filing and Service of Responsive Documents:* Any filing must
(1)bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as applicable;
(2)set forth in the heading the name of the applicant and the project number of the application to which the filing responds;
(3)furnish the name, address, and telephone number of the person protesting or intervening; and
(4)otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to the surrender application that is the subject of this notice. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. q. Agency Comments—Federal, state, and local agencies are invited to file comments on the described proceeding. If any agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. Dated: November 28, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017-26034 Filed 12-1-17; 8:45 am]
Connectionstraces to 3
1 reference not yet in our index
  • 16 USC 791a-825r
Citation graph
cites case law
Notices
DEPARTMENT OF ENERGY
Cite16 USC 791a-825r
Cites 4Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.