Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2015-04-06 · DEPARTMENT OF ENERGY · Notices

Notices. DEPARTMENT OF ENERGY

409 words·~2 min read·/register/2015/04/06/2015-07797

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 5001-06-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14628-001] Minneapolis Leased Housing Associates IV Limited Partnership; Notice of Application Tendered for Filing With the Commission Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. *Type of Application:* Minor License. *b. Project No.:* 14628-001. *c. Date filed:* March 20, 2015. d. *Applicant:* Minneapolis Leased Housing Associates IV, Limited Partnership (Minneapolis Housing Associates). e. *Name of Project:* A-Mill Artist Lofts Hydroelectric Project (A-Mill Project). f. *Location:* On the Mississippi River, in the City of Minneapolis, Hennepin County, Minnesota.
No federal lands are occupied by the project works or located within the project boundary. g. *Filed Pursuant to:* Federal Power Act 16 U.S.C. 791(a)-825(r). h. *Applicant Contact:* Owen Metz, 2905 Northwest Blvd., Suite 150, Plymouth, MN 55441;
(763)354-5618; email *ometz@dominiuminc.com.* i. *FERC Contact:* Shana Murray at
(202)502-8333; or email at *shana.murray@ferc.gov.* j. The application is not ready for environmental analysis at this time. k. The A-Mill Project consists of:
(1)Removal of an existing concrete bulkhead blocking the existing intake structure;
(2)an existing headrace tunnel rehabilitated and sleeved with a new 616-foot-long, 5-foot-diameter steel penstock;
(3)a new vertical steel pipe installed in the existing downstream drop-shaft;
(4)a new 600-kilowatt turbine generator;
(5)a new 6-foot-wide by 4-foot-tall concrete outlet structure at the existing downstream tailrace; and
(6)appurtenant facilities. The average annual generation is estimated to be 3,400 megawatt-hours. l. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at *http://www.ferc.gov* using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at *http://www.ferc.gov/docs-filing/esubscription.asp* to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. m. *Procedural schedule:* The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. Issue Notice of Acceptance: April 2015. Issue notice soliciting final terms and conditions: May 2015. Commission issues EA: July 2015. Dated: March 31, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015-07797 Filed 4-3-15; 8:45 am]
Connectionstraces to 1
Citation graph
cites case law
Notices
DEPARTMENT OF ENERGY
Cites 1Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.