Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2001-06-04 · Office of Fossil Energy, Department of Energy · Notices

Notices. Notice of filing

402 words·~2 min read·/register/2001/06/04/01-13916

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 3710-08-M DEPARTMENT OF ENERGY [Docket Nos. FE C&E 01-65, and C&E 01-66 Certification Notice—200] Office of Fossil Energy; Notice of Filings of Coal Capability of Augusta Energy, LLC and Tenaska Alabama II Partners, L.P. Powerplant and Industrial Fuel Use Act AGENCY: Office of Fossil Energy, Department of Energy. ACTION: Notice of filing. SUMMARY: Augusta Energy, LLC and Tenaska Alabama II Partners, L.P. submitted coal capability self-certifications pursuant to section 201 of the Powerplant and Industrial Fuel Use Act of 1978, as amended.
ADDRESSES: Copies of self-certification filings are available for public inspection, upon request, in the Office of Coal & Power Im/Ex, Fossil Energy, Room 4G-039, FE-27, Forrestal Building, 1000 Independence Avenue, SW., Washington, DC 20585. FOR FURTHER INFORMATION CONTACT: Ellen Russell at
(202)586-9624. SUPPLEMENTARY INFORMATION: Title II of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended (42 U.S.C. 8301 *et seq.* ), provides that no new baseload electric powerplant may be constructed or operated without the capability to use coal or another alternate fuel as a primary energy source. In order to meet the requirement of coal capability, the owner or operator of such facilities proposing to use natural gas or petroleum as its primary energy source shall certify, pursuant to FUA section 201(d), to the Secretary of Energy prior to construction, or prior to operation as a base load powerplant, that such powerplant has the capability to use coal or another alternate fuel. Such certification establishes compliance with section 201(a) as of the date filed with the Department of Energy. The Secretary is required to publish a notice in the **Federal Register** that a certification has been filed. The following owners/operators of the proposed new baseload powerplants have filed a self-certification in accordance with section 201(d). *Owner:* Augusta Energy LLC (C&E 01-65). *Operator:* Calpine Eastern Inc. *Location:* Richmond County, GA. *Plant Configuration:* Combined-cycle. *Capacity:* 825 MW. *Fuel:* Natural gas. *Purchasing Entities:* Wholesale electric market. *In-Service Date:* September 1, 2003. *Owner:* Tenaska Alabama II Partners, L.P. (C&E 01-66). *Operator:* Tenaska Alabama II Partners, L.P. *Location:* Autauga County, AL. *Plant Configuration:* Combined-cycle. *Capacity:* 875 MW. *Fuel:* Natural gas. *Purchasing Entities:* Coral Power, LLC. *In-Service Date:* May, 2003. Issued in Washington, DC, May 29, 2001. Anthony J. Como, Deputy Director, Electric Power Regulation, Office of Coal & Power Im/Ex, Office of Coal & Power Systems, Office of Fossil Energy. [FR Doc. 01-13916 Filed 6-1-01; 8:45 am]
Connectionstraces to 1
Traces to 1 document
Citation graph
cites case law
Notices
Notice of filing
Cites 1Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.