Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2000-10-04 · Coast Guard, DOT · Notices

Notices. Notice of temporary deviation from regulation

368 words·~2 min read·/register/2000/10/04/00-25485

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 4910-15-M DEPARTMENT OF TRANSPORTATION Coast Guard 33 CFR Part 117 [CGD07-00-097] Drawbridge Operation Regulations; Florida East Coast Railway Bridge, across the Okeechobee Waterway, mile 7.4, at Stuart, Martin County, FL AGENCY: Coast Guard, DOT. ACTION: Notice of temporary deviation from regulation. SUMMARY: The Commander, Seventh Coast Guard District, has approved a temporary deviation from the regulations governing the operation of the Florida East Coast Railway bridge across the Okeechobee Waterway, mile 7.4, Stuart, Martin County, Florida.
This deviation allows the drawbridge owner or operator to not open the bridge for short periods of time, approximately 30 to 45 minutes in duration, from 7:00 until 4:00 pm from October 9, 2000 through October 12, 2000. This temporary deviation is required from October 9, 2000 until October 12, 2000, to allow the bridge owner to safely complete repairs of the bridge. DATES: This deviation is effective from October 9, 2000 to October 12, 2000. FOR FURTHER INFORMATION CONTACT: Mr.
Barry Dragon, Chief, Operations Section, Seventh Coast Guard District, Bridge Section at
(305)415-6743. SUPPLEMENTARY INFORMATION: The Florida East Coast Railway drawbridge across the Okeechobee Waterway at Stuart, has a vertical clearance of 7 feet above mean high water
(MHW)measured at the fenders in the closed position and during construction will have a horizontal clearance of 50 feet. On September 8, 2000, Florida East Coast Railway, the drawbridge owner, requested a deviation from the current operating regulation in 33 CFR 117.5 which requires drawbridge to open promptly and fully when a request to open is given. This temporary deviation was requested to allow necessary repairs to the drawbridge in a critical time sensitive manner. The District Commander has granted a temporary deviation from the operating requirements listed in 33 CFR 117.35 for the purpose of repair completion of the drawbridge. Under this deviation, the Florida East Coast Railway Bridge need not open the bridge for short periods of time, approximately 30 to 45 minutes in duration. The deviation is effective for a period of 4 days beginning on October 9, 2000 and ending on October 12, 2000. Dated: September 22, 2000. Greg E. Shapley, Chief, Bridge Administration, Seventh Coast Guard District. [FR Doc. 00-25485 Filed 10-3-00; 8:45 am]
Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Notices
Notice of temporary deviation from regulation
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.