Rules and Regulations. DEPARTMENT OF ENERGY

329 words·~1 min read·/register/2000/05/15/00-12079

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Intent to File an Application for a New License May 8, 2000. *Type of Filing:* Notice of intent to File An Application for a New License. b. *Project:* 2586. c. *Date Filed:* April 24, 2000. d. *Submitted By:* Alabama Electric Cooperative, Inc.—current licensee. e. *Name of Project:* Conecuh River Hydroelectric Project. f. *Location:* On the Conecuh River near the towns of Gantt and River Falls, in Covington County, Alabama. g. *Filed Pursuant to: * Section 15 of the Federal Power Act. h. *Licensee Contact:* Mike Noel, Alabama Electric Cooperative, Inc., 2027 East Three Notch Street, Andalusia, AL 36420
(334)427-3248. i. *FERC Contact:* Ron McKitrick, ronald.mckitrick@ferc.fed.us,
(770)452-3778. j. *Effective date of current license:* May 1, 1965. k. *Expiration date of current license:* April 30, 2005. l. *Description of the Project:* The project consists of the following two developments: The Point “A” Development consists of the following existing facilities:
(1)A 2,800-foot-long earthen dam comprised of a gated concrete spillway section;
(2)a 700-acre reservoir at a normal water surface elevation of 170 feet msl;
(3)a powerhouse, integral with the dam, containing three generating units with a total installed capacity of 5,200 kW,
(4)a 0.39-mile-long, 46-kV transmission line; and
(5)other appurtenances. The Gantt Development consists of the following existing facilities:
(1)A 1,562-foot-long earthen dam comprised of a gated concrete spillway section;
(2)a 2,767-acre reservoir at a normal water surface elevation of 198 feet msl;
(3)a powerhouse, integral with the dam, containing two generating units with a total installed capacity of 3,050 kW, and
(4)other appurtenances. m. Each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by April 30, 2003. David P. Boergers, Secretary. [FR Doc. 00-12079 Filed 5-12-00; 8:45 am]
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.