554.103 Boiler code.

463 words·~2 min read·/fl/title-xxxiii/chapter-554/554-103

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

The department shall adopt by rule a State Boiler Code for the safe construction, installation, inspection, maintenance, and repair of boilers in this state. The rules adopted shall be based upon and shall at all times follow generally accepted nationwide engineering standards, formulas, and practices pertaining to boiler construction and safety.
(1)The department shall adopt an existing code for new construction and installation known as the Boiler and Pressure Vessel Code of the American Society of Mechanical Engineers, including all amendments and interpretations to the A.S.M.E. Boiler and Pressure Vessel Code approved by the A.S.M.E. Council on Codes and Standards subsequent to the adoption of the State Boiler Code, and when so adopted by the department, such amendments and interpretations become a part of the State Boiler Code.
(2)The installer of any boiler placed in use in this state after January 1, 2018, must, before installing the boiler, apply on a form adopted by rule of the department for a permit to install the boiler from the chief boiler inspector. The application must include the boiler’s A.S.M.E. manufacturer’s data report and other documents required by the State Boiler Code before the boiler is placed in service. The installer must contact the chief boiler inspector to schedule an inspection for each boiler no later than 7 days before the boiler is placed in service.
(3)The maximum allowable working pressure of a boiler carrying the A.S.M.E. code symbol must be determined by the applicable sections of the code under which it was constructed and stamped. Subject to the concurrence of the chief boiler inspector, such boiler may be rerated in accordance with the standards of the State Boiler Code.
(4)The maximum allowable working pressure of a boiler that does not carry the A.S.M.E. code symbol must be computed in accordance with the standards of the State Boiler Code.
(5)This chapter may not be construed to in any way prevent the use, sale, or reinstallation of a boiler if such boiler has been made to conform to the applicable provisions of the State Boiler Code governing existing installations and if, upon inspection, the boiler has been found to be in a safe condition.
(6)The department, at its discretion, may authorize the construction, installation, and operation of boilers of special design or construction which do not meet the specific requirements of the State Boiler Code, but which are consistent with the intent of the safety objectives of the code.
(7)The department may adopt rules pursuant to ss. 120.536
(1)and 120.54 to administer this chapter. Such rules may include specifying the procedures and forms to be used to obtain an installation permit, an initial certificate, or a renewal certificate, and the submission of reports and notices required under this chapter.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.