Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · California · Health and Safety Code

§ 25507.2

368 words·~2 min read·/ca/health-and-safety-code/25507-2

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Except as specified in this section, unless required by a local ordinance, the unified program agency shall exempt a business from application of Sections 25506, 25507, 25508.2, and 25511 to an unstaffed facility located at least one-half mile from the nearest occupied structure if the facility is not otherwise subject to the requirements of applicable federal law, and all of the following requirements are met:
(a)The types and quantities of materials onsite are limited to one or more of the following:
(1)One thousand standard cubic feet of compressed inert gases (asphyxiation and pressure hazards only).
(2)Five hundred gallons of combustible liquid used as a fuel source.
(3)Corrosive liquids, not to exceed 500 pounds of extremely hazardous substances, used as electrolytes, and in closed containers.
(4)Five hundred gallons of lubricating and hydraulic fluids.
(5)One thousand two hundred gallons of hydrocarbon gas used as a fuel source.
(6)Any quantity of mineral oil contained within electrical equipment, such as transformers, bushings, electrical switches, and voltage regulators, if the spill prevention control and countermeasure plan has been prepared for quantities that meet or exceed 1,320 gallons.
(b)The facility is secured and not accessible to the public.
(c)Warning signs are posted and maintained for hazardous materials pursuant to the California Fire Code.
(1)Notwithstanding Sections 25505 and 25507, a one-time business plan, except for the emergency response plan and training elements specified in paragraphs
(3)and
(4)of subdivision
(a)of Section 25505, is submitted to the statewide information management system. This one-time business plan submittal is subject to a verification inspection by the unified program agency and the unified program agency may assess a fee not to exceed the actual costs of processing and for inspection, if an inspection is conducted.
(2)If the information contained in the one-time submittal of the business plan changes and the time period of the change is longer than 30 days, the business plan shall be resubmitted within 30 days to the statewide information management system to reflect any change in the business plan. A fee not to exceed the actual costs of processing and inspection, if conducted, may be assessed by the unified program agency.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.