Sec. 357. Colebrook River Reservoir, Connecticut
173 words·~1 min read·
/bill/118/s/4367/es/section-357A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Not later than 90 days after the date on which the Secretary receives a request from the Metropolitan District of Hartford County, Connecticut, to terminate the contract described in paragraph (2), the Secretary shall offer to amend the contract to release to the United States all rights of the Metropolitan District of Hartford, Connecticut, to utilize water storage space in the reservoir project to which the contract applies. The contract referred to in paragraph
(1)and subsection
(b)is the contract between the United States and the Metropolitan District of Hartford County, Connecticut, numbered DA–19–016–CIVENG–65–203, with respect to the Colebrook River Reservoir in Connecticut. On execution of the amendment described in subsection (a)(1), the Metropolitan District of Hartford County, Connecticut, shall be relieved of the obligation to pay the percentage of the annual operation and maintenance expense, the percentage of major replacement cost, and the percentage of major rehabilitation cost allocated to the water supply storage specified in the contract described in subsection (a)(2) for the reservoir project to which the contract applies.