Sec. 122. Nuclear for Brownfield sites

543 words·~2 min read·/bill/118/hr/6544/rh/section-122

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

In this section: The term brownfield site has the meaning given the term in section 101 of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 ( 42 U.S.C. 9601 ). The term Commission means the Nuclear Regulatory Commission. The term covered site means a brownfield site, a retired fossil fuel site, or a site that is both a retired fossil fuel site and a brownfield site. The term production facility has the meaning given the term in section 11 of the Atomic Energy Act of 1954 ( 42 U.S.C. 2014 ).
The term retired fossil fuel site means the site of 1 or more fossil fuel electric generation facilities that are retired or scheduled to retire, including multiunit facilities that are partially shut down. The term utilization facility has the meaning given the term in section 11 of the Atomic Energy Act of 1954 ( 42 U.S.C. 2014 ). Not later than 1 year after the date of enactment of this Act, the Commission shall evaluate the extent to which modification of regulations, guidance, or policy is needed to enable efficient, timely, and predictable licensing reviews for, and to support the oversight of, production facilities or utilization facilities at covered sites.
In carrying out paragraph (1), the Commission shall consider how licensing reviews for production facilities or utilization facilities at covered sites may be expedited by— siting and operating a production facility or a utilization facility at or near existing site infrastructure to support the reuse of such infrastructure, including— electric switchyard components and transmission infrastructure; heat-sink components; steam cycle components; roads; railroad access; and water availability; using early site permits; using plant parameter envelopes or similar standardized site parameters on a portion of a larger site; and using a standardized application for similar sites.
Not later than 14 months after the date of enactment of this Act, the Commission shall submit to the appropriate committees of Congress a report describing any regulations, guidance, and policies evaluated under paragraph (1). Not later than 2 years after the date of enactment of this Act, the Commission shall, based on the evaluation under subsection (b)— develop and implement strategies to enable efficient, timely, and predictable licensing reviews for, and to support the oversight of, production facilities or utilization facilities at covered sites; and initiate a rulemaking to enable efficient, timely, and predictable licensing reviews for, and to support the oversight of, production facilities or utilization facilities at covered sites.
In carrying out paragraph (1), consistent with the mission of the Commission, the Commission shall consider matters relating to— the use of existing site infrastructure; existing emergency preparedness organizations and planning; the availability of historical site-specific environmental data; previously completed environmental reviews required by the National Environmental Policy Act of 1969 ( 42 U.S.C. 4321 et seq. ); activities associated with the potential decommissioning of facilities or decontamination and remediation at covered sites; and community engagement and historical experience with energy production.
Not later than 3 years after the date of enactment of this Act, the Commission shall submit to the Committee on Energy and Commerce of the House of Representatives and the Committee on Environment and Public Works of the Senate a report describing the actions taken by the Commission under subsection (c)(1).
Connectionstraces to 3
Citation graph
cites case law
Sec. 122
Nuclear for Brownfield sites
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.