The studies authorized by paragraphs
(12)and
(13)of section 201(a) shall be considered a continuation of the study that resulted in the Chief’s Report for the project for Papillion Creek and Tributaries Lakes, Nebraska, signed January 24, 2022. The study authorized by section 201(a)(17) shall be considered a resumption and a continuation of the general reevaluation initiated on December 30, 2003. In carrying out the study authorized by section 201(a)(25), the Secretary shall study the South Shore of Long Island, New York, as a whole system, including inlets that are Federal channels. The studies authorized by section 201(b) shall be considered new phase investigations afforded the same treatment as a general reevaluation.