Beginning on the date of enactment of this Act, the project for navigation, Wolf River Harbor, Tennessee, authorized by the Act of August 30, 1935 (chapter 831, 49 Stat. 1034), is modified to reduce, in part, the authorized dimensions of the project, such that the remaining authorized dimensions are as follows: A 250-foot-wide, 9-foot-depth channel with a center line beginning at an approximate point of 35.139634, -90.062343 and extending approximately 1,300 feet to an approximate point of 35.142077, -90.059107.
A 200-foot-wide, 9-foot-depth channel with a center line beginning at an approximate point of 35.142077, -90.059107 and extending approximately 1,800 feet to an approximate point of 35.1467861, -90.057003. A 250-foot-wide, 9-foot-depth channel with a center line beginning at an approximate point of 35.148791, -90.05642 and extending approximately 5,550 feet to an approximate point of 35.160848, -90.050566.
Connectionstraces to 1
Traces to 1 document
statutes-at-large
Citation graph
cites case law
Sec. 324
Wolf River Harbor, Tennessee
Cites 1Cited by 0 across 0 sources