Sec. 1. Short title; table of contents
808 words·~4 min read·
/bill/117/hr/7776/ih/section-1A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
This Act may be cited as the . Water Resources Development Act of 2022 The table of contents for this Act is as follows: Sec. 1. Short title; table of contents. Sec. 2. Secretary defined. Title I—General Provisions Sec. 101. Federal breakwaters and jetties. Sec. 102. Emergency response to natural disasters. Sec. 103. Shoreline and riverine restoration. Sec. 104. Tidal river, bay, and estuarine flood risk reduction. Sec. 105. Removal of man-made obstruction to aquatic ecosystem restoration projects.
Sec. 106. National coastal mapping study. Sec. 107. Public recreational amenities in ecosystem restoration projects. Sec. 108. Preliminary analysis. Sec. 109. Technical assistance. Sec. 110. Corps of Engineers support for underserved communities; outreach. Sec. 111. Project planning assistance. Sec. 112. Managed aquifer recharge study and working group. Sec. 113. Flood easement database. Sec. 114. Assessment of Corps of Engineers levees. Sec. 115. Technical assistance for levee inspections.
Sec. 116. Assessment of Corps of Engineers dams. Sec. 117. National low-head dam inventory. Sec. 118. Tribal partnership program. Sec. 119. Tribal liaison. Sec. 120. Tribal assistance. Sec. 121. Cost sharing provisions for the territories and Indian Tribes. Sec. 122. Sense of Congress on COVID–19 impacts to coastal and inland navigation. Sec. 123. Assessment of regional confined aquatic disposal facilities. Sec. 124. Strategic plan on beneficial use of dredged material. Sec. 125.
Funding to review mitigation banking proposals from non-Federal public entities. Sec. 126. Environmental dredging. Sec. 127. Reserve component training at water resources development projects. Sec. 128. Payment of pay and allowances of certain officers from appropriation for improvements. Sec. 129. Civil works research, development, testing, and evaluation. Sec. 130. Support of Army civil works program. Sec. 131. Washington Aqueduct. Title II—Studies and Reports Sec. 201. Authorization of proposed feasibility studies.
Sec. 202. Expedited completion. Sec. 203. Expedited modifications of existing feasibility studies. Sec. 204. Corps of Engineers reservoir sedimentation assessment. Sec. 205. Assessment of impacts from changing operation and maintenance responsibilities. Sec. 206. Report and recommendations on dredge capacity. Sec. 207. Maintenance dredging data. Sec. 208. Report to Congress on economic valuation of preservation of open space, recreational areas, and habitat associated with project lands.
Sec. 209. Disposition study on Salinas Dam and Reservoir, California. Sec. 210. Excess lands report for Whittier Narrows Dam, California. Sec. 211. Colebrook River Reservoir, Connecticut. Sec. 212. Comprehensive central and southern Florida study. Sec. 213. Report on South Florida ecosystem restoration plan implementation. Sec. 214. Review of recreational hazards at Buford Dam, Lake Sidney Lanier, Georgia. Sec. 215. Port Fourchon Belle Pass Channel, Louisiana. Sec. 216. Hydraulic evaluation of Upper Mississippi River and Illinois River.
Sec. 217. Rend Lake, Carlyle Lake, and Lake Shelbyville, Illinois. Sec. 218. Disposition study on hydropower in the Willamette Valley, Oregon. Sec. 219. Houston Ship Channel Expansion Channel Improvement Project, Texas. Sec. 220. Sabine-Neches waterway navigation improvement project, Texas. Sec. 221. Norfolk Harbor and Channels, Virginia. Sec. 222. Coastal Virginia, Virginia. Sec. 223. Western infrastructure study. Sec. 224. Report on socially and economically disadvantaged small business concerns.
Sec. 225. Report on solar energy opportunities. Sec. 226. Assessment of coastal flooding mitigation modeling and testing capacity. Sec. 227. Report to Congress on easements related to water resources development projects. Sec. 228. Assessment of forest, rangeland, and watershed restoration services on lands owned by the Corps of Engineers. Sec. 229. Report on status of development of electronic system. Sec. 230. GAO studies on mitigation. Sec. 231. Study on waterborne statistics.
Title III—Deauthorizations and Modifications Sec. 301. Deauthorization of inactive projects. Sec. 302. Watershed and river basin assessments. Sec. 303. Forecast-informed reservoir operations. Sec. 304. Lakes program. Sec. 305. Invasive species. Sec. 306. Project reauthorizations. Sec. 307. Los Angeles County, California. Sec. 308. Deauthorization of designated portions of the Los Angeles County Drainage Area, California. Sec. 309. San Francisco Bay, California. Sec. 310. Columbia River basin.
Sec. 311. Port Everglades, Florida. Sec. 312. South Florida Ecosystem Restoration Task Force. Sec. 313. Chicago shoreline protection. Sec. 314. Great Lakes and Mississippi River Interbasin project, Brandon Road, Will County, Illinois. Sec. 315. Southeast Des Moines levee system, Iowa. Sec. 316. Lower Mississippi River comprehensive management study. Sec. 317. Lower Missouri River streambank erosion control evaluation and demonstration projects. Sec. 318. Missouri River interception-rearing complexes.
Sec. 319. Missouri River mitigation project, Missouri, Kansas, Iowa, and Nebraska. Sec. 320. Northern Missouri. Sec. 321. Israel River, Lancaster, New Hampshire. Sec. 322. Middle Rio Grande flood protection, Bernalillo to Belen, New Mexico. Sec. 323. Southwestern Oregon. Sec. 324. Wolf River Harbor, Tennessee. Sec. 325. Addicks and Barker Reservoirs, Texas. Sec. 326. Water level management pilot project on the Upper Mississippi River and Illinois Waterway System. Sec. 327. Upper Mississippi River protection.
Sec. 328. Treatment of certain benefits and costs. Sec. 329. Debris removal. Sec. 330. General reauthorizations. Sec. 331. Conveyances. Sec. 332. Environmental infrastructure. Sec. 333. Additional assistance for critical projects. Title IV—Water Resources Infrastructure Sec. 401. Project authorizations.