Sec. 401. Project authorizations
596 words·~3 min read·
/bill/117/hr/7776/eh/section-401A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The following projects for water resources development and conservation and other purposes, as identified in the reports titled Report to Congress on Future Water Resources Development submitted to Congress pursuant to section 7001 of the Water Resources Reform and Development Act of 2014 ( 33 U.S.C. 2282d ) or otherwise reviewed by Congress, are authorized to be carried out by the Secretary substantially in accordance with the plans, and subject to the conditions, described in the respective reports or decision documents designated in this section:
A. State B. Name C. Date of Report of Chief of Engineers D. Estimated Costs 1. AK Elim Subsistence Harbor Study, Elim March 12, 2021 Federal: $74,905,000 Non-Federal: $1,896,000 Total: $76,801,000 2. CA Port of Long Beach Deep Draft Navigation, Los Angeles County October 14, 2021 and May 31, 2022 Federal: $73,533,500 Non-Federal: $74,995,500 Total: $148,529,000 3. GA Brunswick Harbor Modifications, Glynn County March 11, 2022 Federal: $10,774,500 Non-Federal: $3,594,500 Total: $14,369,000 4.
WA Tacoma Harbor Navigation Improvement Project May 26, 2022 Federal: $120,701,000 Non-Federal: $174,627,000 Total: $295,328,000 A. State B. Name C. Date of Report of Chief of Engineers D. Estimated Costs 1. AL Selma Flood Risk Management and Bank Stabilization October 7, 2021 Federal: $15,533,100 Non-Federal: $8,363,900 Total: $23,897,000 2. AL Valley Creek Flood Risk Management, Bessemer and Birmingham October 29, 2021 Federal: $17,725,000 Non-Federal: $9,586,000 Total: $27,311,000 3.
CA Lower Cache Creek, Yolo County, Woodland and Vicinity June 21, 2021 Federal: $215,152,000 Non-Federal: $115,851,000 Total: $331,003,000 4. NE Papillion Creek and Tributaries Lakes January 24, 2022 Federal: $91,491,400 Non-Federal: $52,156,300 Total: $143,647,700 5. OR Portland Metro Levee System August 20, 2021 Federal: $77,111,100 Non-Federal: $41,521,300 Total: $118,632,400 A. State B. Name C. Date of Report of Chief of Engineers D. Estimated Costs 1. CT Fairfield and New Haven Counties Coastal Storm Risk Management January 19, 2021 Federal: $92,937,000 Non-Federal: $50,043,000 Total: $142,980,000 2.
FL Florida Keys, Monroe County, Coastal Storm Risk Management September 24, 2021 Federal: $1,513,531,000 Non-Federal: $814,978,000 Total: $2,328,509,000 3. FL Pinellas County, Treasure Island and Long Key Segments, Coastal Storm Risk Management October 29, 2021 Initial Federal: $8,627,000 Initial Non-Federal: $5,332,000 Total: $13,959,000 Renourishment Federal: $92,000,000 Renourishment Non-Federal: $101,690,000 Renourishment Total: $193,690,000 4. LA Upper Barataria Basin Hurricane and Storm Damage Risk Reduction January 28, 2022 Federal: $1,005,001,000 Non-Federal: $541,155,000 Total: $1,546,156,000 5.
PR San Juan Metropolitan Area Coastal Storm Risk Management September 16, 2021 Federal: $245,418,000 Non-Federal: $131,333,000 Total: $376,751,000 6. SC Folly Beach, Coastal Storm Risk Management October 26, 2021 Initial Federal: $45,490,000 Initial Non-Federal: $5,054,000 Total: $50,544,000 Renourishment Federal: $164,424,000 Renourishment Non-Federal: $26,767,000 Renourishment Total: $191,191,000 A. State B. Name C. Date of Report of Chief of Engineers D. Estimated Costs 1.
TX Coastal Texas Protection and Restoration September 16, 2021 Federal: $19,237,894,000 Non-Federal: $11,668,393,000 Total: $30,906,287,000 A. State B. Name C. Date of Report of Chief of Engineers D. Estimated Costs 1. CA Prado Basin Ecosystem Restoration, San Bernardino, Riverside and Orange Counties April 22, 2021 Federal: $33,976,000 Non-Federal: $18,294,000 Total: $52,270,000 2. KY Three Forks of Beargrass Creek Ecosystem Restoration, Louisville May 24, 2022 Federal: $72,138,000 Non-Federal: $48,998,000 Total: $121,136,000 A.
State B. Name C. Date of Decision Document D. Estimated Costs 1. DC Washington, D.C. and Vicinity Flood Risk Management July 22, 2021 Federal: $17,740,000 Non-Federal: $0 Total: $17,740,000 2. LA Lake Pontchartrain and Vicinity December 16, 2021 Federal: $807,000,000 Non-Federal: $434,000,000 Total: $1,241,000,000 3. LA West Bank and Vicinity December 17, 2021 Federal: $431,000,000 Non-Federal: $232,000,000 Total: $663,000,000 4. WA Howard A. Hanson Dam, Water Supply and Ecosystem Restoration May 19, 2022 Federal: $815,207,000 Non-Federal: $39,979,000 Total: $855,185,000
Connectionstraces to 1
Traces to 1 document
U.S. Code
Citation graph
cites case law
Sec. 401
Project authorizations
Cites 1Cited by 0 across 0 sources