Sec. 203. Expedited completion of reports for certain projects
697 words·~3 min read·
/bill/115/hr/8/pcs/section-203A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The Secretary shall expedite the completion of a feasibility study for each of the following projects, and if the Secretary determines that the project is justified in a completed report, may proceed directly to preconstruction planning, engineering, and design of the project: Project for riverbank stabilization, Selma, Alabama. Project for ecosystem restoration, Three Mile Creek, Alabama. Project for navigation, Nome, Alaska. Project for flood diversion, Seward, Alaska. Project for navigation, Three Rivers, Arkansas.
Project for flood control, water conservation, and related purposes, Coyote Valley Dam, California. Project for flood risk management, Lower Cache Creek, California. Project for flood risk management, Lower San Joaquin River, California, as described in section 1322(b)(2)(F) of the Water Resources Development Act of 2016 (130 Stat. 1707) (second phase of feasibility study). Project for flood risk management, South San Francisco, California. Project for flood risk management and ecosystem restoration, Tijuana River, California.
Project for flood risk management in East Hartford, Connecticut. Project for flood risk management in Hartford, Connecticut. Projects under the Comprehensive Flood Mitigation Study for the Delaware River Basin. Project for ecosystem restoration, Lake Apopka, Florida. Project for ecosystem restoration, Kansas River Weir, Kansas. Project for water resource improvements, Willamette River Basin, Fern Ridge, Oregon. Project for navigation, San Juan Harbor, Puerto Rico. Project for ecosystem restoration, Resacas at Brownsville, Texas.
Project for navigation, Norfolk Harbor, Virginia. Project for coastal storm risk management, Norfolk, Virginia. Project for navigation, Tacoma Harbor, Washington. Project for flood damage reduction, Westminster-East Garden Grove, California. Project for hurricane and storm damage risk reduction and ecosystem restoration, Southwest Coastal Louisiana, Louisiana, authorized by section 1401(8) of the Water Resources Development Act of 2016 (130 Stat. 1715). Project for navigation and channel deepening, Baptiste Collette Bayou, Louisiana, under section 203 of the Water Resources Development Act of 1986 ( 33 U.S.C. 2231 ).
Project for navigation and channel deepening, Houma Navigation Canal, Louisiana, under section 203 of the Water Resources Development Act of 1986 ( 33 U.S.C. 2231 ). Project for navigation and channel deepening, Bayou Lafourche, Louisiana, under section 203 of the Water Resources Development Act of 1986 ( 33 U.S.C. 2231 ). Projects under the Great Lakes Mississippi River Interbasin Study Brandon Road Study. Project for ecosystem restoration, Warren Glen Dam Removal, Musconetcong River, New Jersey.
Project for flood control and water supply, Abiquiu Dam, New Mexico. Project for reformulation, East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, Queens, New York. In expediting completion of the second phase of the Lower San Joaquin River feasibility study under subsection (a)(8), the Secretary shall review and give priority to any plans and designs requested by non-Federal interests and incorporate such plans and designs into the Federal study if the Secretary determines that such plans and designs are consistent with Federal standards.
The Secretary shall expedite completion of a post-authorization change report for the following projects: Project for flood risk management, San Luis Rey River Flood Control Protection Project, California. Project for flood risk management, Success Reservoir Enlargement Project, California. Everglades Agricultural Area Reservoir, Central Everglades Planning Project, Florida. Project for navigation, Sault Sainte Marie, Michigan. Section 2010 of the Water Resources Reform and Development Act of 2014 (128 Stat. 1270) is amended by adding at the end the following:
In carrying out a disposition study with respect to the Upper St. Anthony Falls Lock and Dam, including a disposition study under section 216 of the Flood Control Act of 1970 ( 33 U.S.C. 549a ), the Secretary shall expedite completion of such study and shall produce a report on the Upper St. Anthony Falls Lock and Dam that is separate from any report on any other lock or dam included in such study that includes plans for— carrying out modifications to the Upper St. Anthony Falls Lock and Dam to— preserve and enhance recreational opportunities and the health of the ecosystem; and maintain the benefits to the natural ecosystem and human environment; a partial disposition of the Upper St.
Anthony Falls Lock and Dam facility and surrounding real property that preserves any portion of the Upper St. Anthony Falls Lock and Dam necessary to maintain flood control; and expediting the disposition described in this subsection (d). .
Connectionstraces to 2
3 references not yet in our index
- 130 Stat. 1707
- 130 Stat. 1715
- 128 Stat. 1270
Citation graph
cites case law
Sec. 203
Expedited completion of reports for certain projects
Stat.130 Stat. 1707
Stat.130 Stat. 1715
Stat.128 Stat. 1270
Cites 5Cited by 0 across 0 sources