Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · BILL · 114th Congress · H.R. 5595 (Introduced in House) — To direct the Secretary of the Army, acting through the Chief of Engineers, to revise the water manuals of certain fl... · Sec. 3

Sec. 3. Identification of Eligible Projects

358 words·~2 min read·/bill/114/hr/5595/ih/section-3

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Not later than 180 days after the date of enactment of this Act, the Secretary shall submit to the Committees on Appropriations and Environment and Public Works of the Senate and the Committees on Appropriations and Transportation and Infrastructure of the House of Representatives a report that includes, with respect to any State that is a drought State during water year 2015 or 2016— a list of each flood control project located in such a State; the year during which the original water manual for each such project was approved; the year or years during which any revisions to the water manual of any such project occurred or are requested to occur; a list of each such project for which operational deviations for drought contingency have been requested, and the status of such request; a list of each such project for which permanent or seasonal changes to storage allocations have been requested, and the status of such request; and a description of the means by which water conservation and water quality improvements were addressed in any response to a request under paragraph
(4)or (5). The Secretary shall incorporate into the report under subsection
(a)any information or finding that is— included in or gathered for a report required by section 1046(a)(2) of the Water Resources Reform and Development Act of 2014 ( 33 U.S.C. 2319 note); and relevant to the subject matter of the report under subsection
(a)of this section. Not later than 60 days after the date on which the report under subsection
(a)is submitted, the Secretary shall identify each flood control project— that is included in the report under subsection (a); that includes a reservoir; and for which a non-Federal interest has submitted to the Secretary a written request, pursuant to subsection (d), to revise the water manual for the project. Not later than 60 days after the date of enactment of this Act, the Secretary shall publish in the Federal Register the manner in which a non-Federal interest for a flood control project may submit to the Secretary a written request under subsection (c)(3) to revise the water manual for the project.
Connectionstraces to 1
Traces to 1 document
Citation graph
cites case law
Sec. 3
Identification of Eligible Projects
Cites 1Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.