Sec. 3115. Hanford Waste Treatment and Immobilization Plant contract oversight
629 words·~3 min read·
/bill/114/hr/1735/eas/section-3115A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Subtitle C of title XLIV of the Atomic Energy Defense Act ( 50 U.S.C. 2621 et seq. ) is amended by adding at the end the following new section: Not later than 180 days after the date of the enactment of the National Defense Authorization Act for Fiscal Year 2016, the Secretary of Energy shall arrange to have an owner's agent assist the Secretary in carrying out the oversight responsibilities of the Secretary with respect to the contract described in subsection (b). The contract described in this subsection is the contract between the Office of River Protection of the Department of Energy and Bechtel National, Inc. or its successor relating to the Hanford Waste Treatment and Immobilization Plant (contract number DE–AC27–01RV14136).
The duties of the owner's agent under subsection
(a)shall include the following: Performing design, construction, nuclear safety, and operability oversight of each facility covered by the contract described in subsection (b). Beginning not later than one year after the date of the enactment of the National Defense Authorization Act for Fiscal Year 2016, ensuring that the preliminary documented safety analyses for all facilities covered by the contract meet the requirements of all applicable Department of Energy regulations and guidance, including section 830.206 of title 10, Code of Federal Regulations, and the Department of Energy Standard on the Integration of Safety into the Design Process (DOE–STD–1189–2008). Assisting the Secretary in ensuring that, until the Secretary approves the documented safety analysis for each facility covered by the contract, the contractor ensures that each preliminary documented safety analysis is current. Ensuring that the contractor acts to promptly resolve any unreviewed safety questions. Not later than one year after the date of the enactment of the National Defense Authorization Act for Fiscal Year 2016, and every 180 days thereafter, the owner's agent specified in subsection
(a)shall submit to the Secretary and the congressional defense committees a report on the assistance provided by the owner's agent to the Secretary under that subsection with respect to oversight of the contract described in subsection (b). The report required by paragraph
(1)shall include the following: Information on the status of, and the plan for resolving, each unreviewed safety question at each facility covered by the contract described in subsection (b). An identification of each instance of disagreement between the owner's agent and the contractor with respect to whether an unreviewed safety question exists and the plan for resolution of the disagreement. An identification of each aspect of each preliminary documented safety analysis that is not current, the plan for making that aspect current, and the status of the corrective efforts. Information on the status of, and the plan for resolving, each unresolved technical issue at each facility covered by the contract, and the status of corrective efforts. In this section: The term contractor means Bechtel National, Inc. The term current , with respect to a documented safety analysis, means that the documented safety analysis includes any design changes approved by the contractor and any safety evaluation reports issued by the Secretary with respect to the facility covered by the analysis before the date that is 60 days before the date of the analysis. The terms documented safety analysis , safety evaluation report , and unreviewed safety question have the meanings given those terms in section 830.3 of title 10, Code of Federal Regulations (or any corresponding similar ruling or regulation). The term owner's agent means a private third-party entity with nuclear safety management expertise and without any contractual relationship with the contractor or conflict of interest. . The table of contents for the Atomic Energy Defense Act is amended by inserting after the item relating to section 4445 the following new item: Sec. 4446. Hanford Waste Treatment and Immobilization Plant contract oversight. .
Connections1 off-index
1 reference not yet in our index
- 50 USC 2621
Citation graph
cites case law
Sec. 3115
Hanford Waste Treatment and Immobilization Plant contract oversight
Cite50 USC 2621
Cites 1Cited by 0 across 0 sources