Sec. 1103. Watershed pilot projects
313 words·~1 min read·
/bill/113/hr/1877/ih/section-1103A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Section 122 ( 33 U.S.C. 1274 ) is amended— in the section heading by striking ; and Wet weather in subsection (a)— in the matter preceding paragraph (1)— by striking for treatment works and inserting to a municipality or municipal entity ; and by striking of wet weather discharge control ; in paragraph
(2)by striking in reducing such pollutants and all that follows before the period at the end and inserting to manage, reduce, treat, or reuse municipal stormwater, including low-impact development technologies and other techniques that utilize infiltration, evapotranspiration, and reuse of storm water on site ; and by adding at the end the following: Efforts of municipalities and property owners to demonstrate cooperative ways to address nonpoint sources of pollution to reduce adverse impacts on water quality. The development of an integrated water resource plan for the coordinated management and protection of surface water, ground water, and stormwater resources on a watershed or subwatershed basis to meet the objectives, goals, and policies of this Act. The development of a municipality-wide plan that identifies the most effective placement of storm water technologies and management approaches, including green infrastructure, to reduce water quality impairments from storm water on a municipality-wide basis. Efforts to assess future risks and vulnerabilities of publicly owned treatment works to man-made or natural disasters, including extreme weather events and sea-level rise, and to carry out measures, on a system-wide or area-wide basis, to increase the resiliency of publicly owned treatment works. . The first sentence of section 122(c)(1) is amended— by striking “and”; and by striking the period and inserting , such sums as may be necessary for each of fiscal years 2005 through 2013, and $120,000,000 for each of fiscal years 2014 through 2018 . Section 122(d) is amended by striking 5 years after the date of enactment of this section, and inserting October 1, 2015, .
Connectionstraces to 1
Traces to 1 document
U.S. Code
Citation graph
cites case law
Sec. 1103
Watershed pilot projects
Cites 1Cited by 0 across 0 sources